FANDOM


Starting in the mid 1990s, efforts were made by a preservation society to recreate part of the original route. This group succeeded in acquiring Moyasta station, and 5 km (3.1 mi) of track bed. Passenger services were resumed using two new steel coaches with bench seating, parallel to the direction of travel, built by Alan Keef Engineering and outfitted locally in wood by WCR engineers. A small but powerful diesel locomotive built for Channel Tunnel construction work hauled the trains.

On 5 July 2009 the West Clare Railway's original steam locomotive No 5 Slieve Callan was returned to the West Clare Railway at Moyasta Junction following restoration in England by Alan Keef Engineering Ltd of Ross-on-Wye. This engine had previously been a static exhibit at the mainline railway station in Ennis. The locomotive was steamed for the first time on 14 July marking the return of steam to the West Clare railway after an absence of over 57 years.

The railway has since acquired a number of redundant diesel locomotives, mostly from the Irish Bord na Móna; these are being gradually restored and returned to service.

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.